Excavation Team
Harappa excavators
376
 
After marking, the entire excavation team is called in to map and eventually collect the bead manufacturing debris and all of the sediment from each layer of Ravi phase floors.
 
INDEX | PRINT MAIN | CREDITS
INDUS | HOME
© Harappa 2005